Floor installation in Virginia

Step two is the day the floor goes down. We lay six kinds of work, each with its own page below. Whatever the floor, install day runs in the same order: protect, lift, prepare, lay, trim and walk through.

Install day, in order

Whatever floor you chose, the day follows the same six parts.

  1. Protect

    Dust sheets in doorways, runners on the path to the door, and the larger furniture carried out of the rooms.

  2. Lift

    The old carpet, pad, sheet vinyl or plank comes up and leaves with us. Staples and nails are pulled.

  3. Prepare

    Low spots are filled, high spots ground down and loose areas of the subfloor screwed tight. Underlayment goes down where the floor calls for it.

  4. Lay

    The first row is set straight off a line, joints are staggered and cuts are made outside or in the garage where possible.

  5. Trim

    Baseboard goes back on or new trim is fitted, transitions are set at doorways and nail holes are filled.

  6. Walk through

    The rooms are swept and vacuumed, furniture goes back on felt pads and we look at every room and doorway with you.

Your short prep list

We move the larger furniture. These small things help the day go smoothly.

  • Box up small items, books and anything fragile in the rooms
  • Empty the closets that are getting a new floor
  • Take down wall art near the floor and unplug electronics
  • Plan where pets and children will be for the day
  • Leave a parking spot near the door for the crew
  • Point out anything under the floor we should know about

How long a job takes

Most single rooms are finished in a day. A whole main level of vinyl plank or laminate often takes two or three days, and hardwood takes longer because each board is nailed by hand. Rooms that need a lot of leveling add time for the compound to set. The written estimate gives you the plan for your rooms, and we let you know the evening before if anything changes.

After the floor is down

Before we leave, we walk through each room with you, check every doorway and transition and leave a short care note for the floor you chose. Unopened boxes and a few spare planks stay with you, which makes any future repair much easier. If a threshold or strip of trim needs a second look later, call during office hours and we set a time to come back.

Questions about install day

Can we stay in the house during the install?

Yes. Most people go about their day in the rooms that are not being worked on. We keep a clear path and tidy up as we go.

Who moves the furniture?

We move the larger pieces as part of the job. Please box up small items and empty closets ahead of time.

What happens to the old floor?

The old covering and the offcuts leave with us at the end of the day.